Accelerator Complex Capabilities – Resources
| Date | Title | Type of document |
| December 2018 | SPS Operation and Future Proton Sharing scenarios for the SHiP experiment at the BDF facility | Note |
| May 2019 | Protons Beyond the LHC Injectors Upgrade Project | Report |
| May 2019 | Beam manipulations with barrier buckets in the CERN PS | IPAC paper |
| May 2019 | Barrier bucket studies in the CERN PS | IPAC paper |
| November 2019 | Barrier bucket and transversely split beams for loss-free multi-turn extraction in synchrotrons | Paper |
| December 2019 | Source of horizontal instability at the CERN Proton Synchrotron Booster | Paper |
| March 2021 | Beam Loss Reduction by Barrier Buckets in the CERN Accelerator Complex | Thesis |